Edelmetalen « Terug naar discussie overzicht

NOVO Resources: Grootste goudvondst OOIT?!

891 Posts, Pagina: « 1 2 3 4 5 6 ... 35 36 37 38 39 40 41 42 43 44 45 » | Laatste
drulletje drie
0
Novo Announces Appointment of Michael Spreadborough to Board of Directors

VANCOUVER, British Columbia, Jan. 13, 2021 (GLOBE NEWSWIRE) -- Novo Resources Corp. (“Novo” or the “Company”) (TSX: NVO & NVO.WT; OTCQX: NSRPF) is pleased to announce that Mr. Michael Spreadborough has accepted an invitation to join its board of directors.

Michael Spreadborough is currently CEO of Metals X Limited (ASX: MLX) and previously Managing Director & CEO of Nusantara Resources and a Non-Executive Director of CleanTeQ Holdings. Mr. Spreadborough has a mining engineering background, with over 30 years’ experience in mining lead, zinc, uranium, copper, gold and iron ore.

He has held roles across the scope of the resources industry from business and project development, to operations and exploration. In recent times, Mr. Spreadborough was the General Manager – Mining for Western Mining Corporation, and then later the Vice President – Mining for BHP Billiton, at the world-class Olympic Dam Mine in South Australia. Mr. Spreadborough was previously the General Manager – Coastal Operations for Rio Tinto, responsible for port operations and the Pannawonica mine site in the Pilbara region of Western Australia. He then assumed the position of Chief Operating Officer for Inova Resources Ltd (formerly Ivanhoe Australia) and Sandfire Resources.

Mr. Spreadborough holds a Bachelor of Mining Engineering from the University of Queensland, an MBA from Deakin University, and a WA First Class Mine Manager’s Certificate of Competency. Additionally, Mr. Spreadborough is a Fellow of the Australasian Institute of Mining and Metallurgy and a member of the Australian Institute of Company Directors.

“Novo is delighted to welcome Mr. Spreadborough to our board of directors,” commented Dr. Quinton Hennigh, President and Chairman of the Company. “Mr. Spreadborough brings with him a wealth of Australian resource industry operational experience and international executive public company experience. His experience strengthens operational oversight within Novo’s board. We look forward to working with Mike as we advance towards production.”

The Company is also pleased to report that development at its Nullagine gold project continues in line with schedule and budget. Further detailed operational updates will be released over the coming weeks.
fiesta
0
This week Jay Taylor bought more NOVO shares and he said:Personally this week, I added to my positions in Novo Resources and Great Bear Resources, in part because I see their respective
projects having very low energy costs. With regard to Novo, I believe the company is on track to begin production by mid February if
not sooner, and I’m betting that profit margins will surprise to the upside. Sure, there are likely to be some hiccups at the start, but I’m
very optimistic that the Beatons Creek startup will spur on a new mining story and ultimately a revolutionary breakthrough for the
mining sector using separation technology, which should dramatically lower costs of certain projects.
drulletje drie
1
Novo Receives Final Regulatory Approvals and Provides an Operational Update From Beatons Creek

VANCOUVER, British Columbia, Feb. 03, 2021 (GLOBE NEWSWIRE) -- Novo Resources Corp. (“Novo” or the “Company”) (TSX: NVO & NVO.WT; OTCQX: NSRPF) is pleased to announce all regulatory approvals have now been received and provide an operational update from its 100% controlled Beatons Creek gold project (“Beatons Creek”) and Nullagine processing facility (“Golden Eagle Mill”).

Highlights:

Development at Beatons Creek and refurbishment at the Golden Eagle Mill continue to progress safely, on schedule and within budget. Recent key events and milestones include:

All regulatory approvals have now been received from the Western Australian Department of Mines, Industry Regulation, and Safety (“DMIRS”) and Department of Water and Environmental Regulation (“DWER”) to allow commissioning of Beatons Creek material and deposition of Beatons Creek tailings product into the Golden Eagle Mill’s tailings storage facility. The Project is now advancing towards commercial production, with plant commissioning activities currently underway (see figure 1 below);
Iron Mine Contracting Pty Ltd (“IMCPL”) continue to ramp up excavation activities at Beatons Creek, with all major equipment now mobilized to site and all crews fully manned. Mobilization of a larger Komatsu PC1250 excavator occurred earlier this week (see figure 2 below);
Rivet Mining Services Pty Ltd (“Rivet”) has been named as the Company’s preferred haulage contractor for transportation of material from Beatons creek to the ROM pad at the Golden Eagle Mill, and crusher feed contractor to maintain the ROM pad and feed the crusher. An interim arrangement has been operating throughout January which will phase out as Rivet mobilize their plant and equipment;
GR Engineering Services (“GRES”), Duratec Limited (“Duratec”), and Northfields WA Pty Ltd (“Northfields”) plant refurbishment scopes of work are now effectively complete. All tanks have been fully refurbished, key new gravity circuit componentry has been installed and all concreting works are complete. The plant has now entered the commissioning phase. Refurbishment works have been completed ahead of time and well within budget.
Site personnel (including contractors) now total 128.
Please see the Company’s news release dated December 17, 2020 for the Company’s previous operational update.

Development activities at Beatons Creek:

IMCPL and Edwards Earthmoving Pty Ltd continue with project establishment and development works (see figure 3 below);
IMCPL continue the equipment and personnel ramp up to site, with the fleet now comprised of : 3 x D10 dozers, 1 x Komatsu PC1250 excavator, 2 x Komatsu PC850 excavators, 3 x Cat 777 trucks, 6 x Cat 745 trucks and ancillary grading, water cart and service truck support equipment (see figure 4 below);
Rivet have been named as the Company’s preferred contractor for crusher feed and haulage of ore between Beatons Creek and the Golden Eagle Mill. Importantly, Rivet were the incumbent contractor at site prior to the period of care and maintenance, bringing a wealth of local operating knowledge to the project. Rivet also bring intelligent MT Data systems to the project with fatigue monitoring systems ensuring operator and public safety, in addition to speed monitoring systems ensuring haulage speeds are managed through the early phase of the project that requires haulage through the town of Nullagine;
Phase 2 grade control reverse circulation drilling has recommenced at Beatons Creek following completion of the initial grade control drilling program. The first four months of mill feed are now covered by grade control drilling, with ongoing works aimed at extending coverage over a longer period of time.
Contractor maintenance and administration facilities have been installed at Beatons Creek. (see figure 5 below).
Refurbishment works on the Golden Eagle Mill:

Plant refurbishment:

The GRES scope is now complete, with GRES personnel demobilizing from site later this week. Variances to the scope resulted in a superior outcome to the original plan and impressively this was completed within the budgeted cost;
Key componentry has returned from refurbishment in Perth has all been reinstalled on schedule;
The refurbishment of all 9 tanks, agitators, inter-tank screens, carbon transfer pumps and launders is now complete;
Gravity circuit components have all been installed, pipework completed and powered up ahead of commissioning (see figure 6 and figure 7 below);
Processing plant laboratory componentry has been refurbished and recommissioned and is now fully operational and manned ahead of plant commissioning;
Novo has completed refurbishment works on the crusher feed bin, crusher and crusher stockpile feeders with the complete dry plant area ready for commissioning;
Commissioning is now underway, with initial material feed to primarily consist of low grade stocks from historical mining conducted by Millennium Minerals and the balance of the 2016 Beatons Creek bulk sampling stockpile (see figure 8 and figure 9 below).
Civil works:

Northfields’ scope has now been completed, with mining drilling and workshop pads complete along with foundations laid for the upgraded Acacia gold-recovery reactor unit, new elution tank footings in the gold room and repairs to existing bunding and retainment walls that will allow for excellent housekeeping and fluids containment around the plant.
“Operations proceeded according to plan throughout the holiday season and January and we thank all Novo employees and contractors for their contributions over this time,” commented Novo CEO and director, Rob Humphryson. “Despite severe weather conditions, works have proceeded beyond expectation and we thank our plant refurbishment contracting partners for delivering us a plant that met the brief of being safe, reliable, and suitable for processing Beatons Creek material. With all regulatory approvals now to hand, we turn our focus to commissioning the processing plant and advancing Beatons Creek towards production.”

Tuscarora Project Update

The Company is also pleased to announce that American Pacific Mining Corp. (“American Pacific”) has completed its earn-in and now owns a 100% interest in the Tuscarora gold project (“Tuscarora”) in Nevada, USA. Novo retains a 0.5% net smelter returns royalty over Tuscarora which American Pacific can repurchase for US$500,000 at any time. Please see the Company’s news release dated November 6, 2017 for further details.

Dr. Quinton Hennigh (P.Geo.) is the qualified person pursuant to NI 43-101 responsible for, and having reviewed and approved, the technical information contained in this news release. Dr. Hennigh is President, Chairman, and a director of Novo.
Leppo
0
drulletje drie
0
quote:

Leppo schreef op 3 februari 2021 18:06:

wow das goed nieuws, binnen kort starten ze daar met mijnen.
Bedank voor de info
Ja alles zou nu geregeld moeten zijn om in dit kwartaal goud te mijnen!

Ben erg benieuwd of het ze deze maand al gaat lukken ;)
drulletje drie
0
Novo Resources Corp CAD 2,59 0,31 13,60 %

Begint door te dringen dat ze deze maand echt goud uit de grond gaan halen !
CAD 2.59 voor een bedrijf dat goud produceert .... lijkt me nog een koopje!
drulletje drie
0
drulletje drie
0
Novo Resources Corp CAD 2,71 0,43 18,86 %

Laatste keer dat ik hem onder de aandacht breng ;)

Morgen gaan we waarschijnlijk nog een stukje hoger! Zie $ 5.00 plus binnen een maand!
DeZwarteRidder
0
quote:

drulletje drie schreef op 3 februari 2021 21:36:

Novo Resources Corp CAD 2,59 0,31 13,60 %

Begint door te dringen dat ze deze maand echt goud uit de grond gaan halen !
CAD 2.59 voor een bedrijf dat goud produceert .... lijkt me nog een koopje!
Het gaat om de hoeveelheid goud, Slimpie.......!!!

drulletje drie
0
quote:

DeZwarteRidder schreef op 4 februari 2021 10:17:

[...]

Het gaat om de hoeveelheid goud, Slimpie.......!!!

Als je nou niet normaal kan reageren, reageer dan lekker niet joh!!

Wat ben jij een vervelend persoon zeg pfff. Denkt alles beter te weten maar zeggen waar meneer of mevrouw zelf in belegd doet ie niet! Presteert waarschijnlijk net zo weinig als dat ie zinnigs post!

Hoeveelheid goud is gewoon prima ... slimpie!!!!
DeZwarteRidder
0
quote:

drulletje drie schreef op 4 februari 2021 10:20:

[...]
Als je nou niet normaal kan reageren, reageer dan lekker niet joh!!

Wat ben jij een vervelend persoon zeg pfff. Denkt alles beter te weten maar zeggen waar meneer of mevrouw zelf in belegd doet ie niet! Presteert waarschijnlijk net zo weinig als dat ie zinnigs post!

Hoeveelheid goud is gewoon prima ... slimpie!!!!
Dat laatste moet nog blijken.

De koersen van goudmijnen zijn vooral afhankelijk van de bewezen hoeveelheid goud in de grond en het grote probleem van Novo is dat ze dat niet kunnen bewijzen.
drulletje drie
0
quote:

DeZwarteRidder schreef op 4 februari 2021 10:27:

[...]
Dat laatste moet nog blijken.

De koersen van goudmijnen zijn vooral afhankelijk van de bewezen hoeveelheid goud in de grond en het grote probleem van Novo is dat ze dat niet kunnen bewijzen.
Dus het kan er ook wel zijn dus?
Jij denkt dat ze dit allemaal overhoop halen en dan tot de conclusie komen dat er niets zit??

Iemand aanvallen als je zelf dus ook helemaal niet weet of er goud in de grond zit of niet...

drulletje drie
0
Novo Makes Final Comet Well Payment and Provides Update on Mechanical Sorting Plans

VANCOUVER, British Columbia, Feb. 04, 2021 (GLOBE NEWSWIRE) -- Novo Resources Corp. (“ Novo ” or the “ Company ”) (TSX: NVO & NVO.WT; OTCQX: NSRPF) is pleased to announce that it has made its final payment for the Comet Well Project in the Karratha region of Western Australia comprised of A$3 million cash and 1,198,395 common shares (the “ Consideration Shares ”) ( please see the Company’s news release dated August 3, 2017 for further details ). The Consideration Shares are subject to a statutory hold period expiring on June 5, 2021.


As discussed in Company news releases dated June 18, 2020 and December 8, 2020 , Novo is planning bulk excavation and field mechanical sorting tests utilizing its new Steinert KSS 100F LIXT fine mechanical sorting unit at Comet Well and the adjoining 100% controlled Purdy’s Reward property, both of which comprise the Karratha gold project. This program is slated for Q2 2021 subject to prerequisite approvals from the Department of Mines, Industry Regulation, and Safety and the Department of Water and Environmental Regulation. Novo sees this field test program as an essential step to move the Karratha gold project forward to production.

“We are happy to conclude the acquisition of Comet Well,” commented Quinton Hennigh, President and Chairman of Novo Resources. “We see the Karratha gold project, of which Comet Well is a part, as our next opportunity to build upon our strategy to grow Novo into a significant gold producer in the Pilbara region of Western Australia. We are now able to streamline processes to get our trial bulk sampling and mechanical sorting program permitted and underway. By late 2021, we hope to show the market a viable path forward for this very important project.”
891 Posts, Pagina: « 1 2 3 4 5 6 ... 35 36 37 38 39 40 41 42 43 44 45 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Markt vandaag

 AEX
872,79  +6,28  +0,72%  13:50
 Germany40^ 18.032,30 +0,96%
 BEL 20 3.888,96 +0,67%
 Europe50^ 4.981,14 +0,90%
 US30^ 38.314,01 +0,17%
 Nasd100^ 17.244,86 +0,20%
 US500^ 5.019,72 +0,06%
 Japan225^ 37.581,21 -0,38%
 Gold spot 2.302,03 -1,08%
 EUR/USD 1,0669 +0,16%
 WTI 81,26 -0,96%
#/^ Index indications calculated real time, zie disclaimer

Stijgers

VIVORYON THER... +36,67%
PROSUS +3,65%
JUST EAT TAKE... +3,32%
ALLFUNDS GROUP +3,15%
NX FILTRATION +2,48%

Dalers

RANDSTAD NV -6,43%
Akzo Nobel -4,66%
NSI -4,00%
FASTNED -3,32%
Fugro -2,22%

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront