Arcelor Mittal « Terug naar discussie overzicht

Arcelor Mittal dec. 2018 (Prikkeldraad)

1.010 Posts, Pagina: « 1 2 3 4 5 6 ... 26 27 28 29 30 31 32 33 34 35 36 ... 47 48 49 50 51 » | Laatste
nieneute
0
quote:

miniature schreef op 13 december 2018 11:12:

KOPEN !!! SLOT WORDT MINIMAAL € 20,50 VANDAAG
denk je? :-)
KijKhumGaaN....
0
quote:

miniature schreef op 13 december 2018 11:12:

KOPEN !!! SLOT WORDT MINIMAAL € 20,50 VANDAAG
Als dat zo uitkomt...
buig ik diep voor u ;-))
nieneute
0
quote:

KijKhumGaaN.... schreef op 13 december 2018 11:51:

[...]

Als dat zo uitkomt...
buig ik diep voor u ;-))
mocht ik jou zijn dan zou ik nog even wachten om je in een hernia te buigen
rene l
0
quote:

nieneute schreef op 13 december 2018 12:45:

[...]

mocht ik jou zijn dan zou ik nog even wachten om je in een hernia te buigen
Let vooral op de intro.

www.youtube.com/watch?v=kYz-31B_zTI
[verwijderd]
0
quote:

miniature schreef op 13 december 2018 11:12:

KOPEN !!! SLOT WORDT MINIMAAL € 20,50 VANDAAG
Kunt u dit uitleggen meneer ik begrijp dat niet
[verwijderd]
0
quote:

rene l schreef op 13 december 2018 08:57:

En nu heb je de huiseconoom Bouman die de stekkerauto aan het promoten is.
Wat een drama deze man, burgers mangelen, financieel een flinke poot uittrekken.

Besef het allemaal maar goed, het leven wordt volgend jaar tussen de 7 en 10% duurder.
En hoef je daar geen econoom voor te zijn, nee, helemaal niet, gewoon simpelweg om je heen kijken.
Trek de broekriem maar weer een gaatje strakker.

Daarom schrijft een oude man zich in voor een cursus Latijn. Vraagt de juffrouw achter de inschrijfbalie: "Waarom nu nog, op Uw leeftijd?"
Zegt de oude man: "Nou als ik straks doodga en in de hemel kom, kan ik tenminste een praatje maken met Petrus"
Juffrouw achter de balie: "Maar als U naar de hel gaat?"
Waarop de oude man zegt: "Ach een woordje Duits spreken we allemaal"
[verwijderd]
0
quote:

miniature schreef op 13 december 2018 11:12:

KOPEN !!! SLOT WORDT MINIMAAL € 20,50 VANDAAG
Bedoelde u niet verkopen meneer ? Het gaat naar beneden , ik had u bijna gevolgd en een beetje gekocht
nieneute
0
quote:

de volharder schreef op 13 december 2018 15:47:

[...]
Daarom schrijft een oude man zich in voor een cursus Latijn. Vraagt de juffrouw achter de inschrijfbalie: "Waarom nu nog, op Uw leeftijd?"
Zegt de oude man: "Nou als ik straks doodga en in de hemel kom, kan ik tenminste een praatje maken met Petrus"
Juffrouw achter de balie: "Maar als U naar de hel gaat?"
Waarop de oude man zegt: "Ach een woordje Duits spreken we allemaal"
die kende ik nog niet >super :-)
Bir
0
Wie voorspelt de koers van MT op 31 december a.s bij het sluiten van de beurs, en wint een virtuele ijstaart?
(Deelnemen kan tot en met 14 december a.s, sluiten van de beurs)

Audit4life. 17,75
Max. 19,99
Kooning 20,78
Tukker51 20,80
Many-S. 21,23
Archie Steel. 21,80
De weg naar 22,00
Moutain Lion 22,22
Bir. 22,45
Modaaltje 22,50
Cherubijn 24,14
Pussy. 25,85

Grt Bir

snuf 14
0
Wie voorspelt de koers van MT op 31 december a.s bij het sluiten van de beurs, en wint een virtuele ijstaart?
(Deelnemen kan tot en met 14 december a.s, sluiten van de beurs)

Audit4life. 17,75
Max. 19,99
Snuf 14 20.00
Kooning 20,78
Tukker51 20,80
Many-S. 21,23
Archie Steel. 21,80
De weg naar 22,00
Moutain Lion 22,22
Bir. 22,45
Modaaltje 22,50
Cherubijn 24,14
Pussy. 25,85

Gr Snuf. (Pussy Golightly op 25.85 lekker optimistisch)
DeWegNaarBeter
0
Omgerekend +/- 6.5 euro.. ik kan er nog steeds niet bij..

Laten we idd hopen op een eindejaars spurt omhoog!
[verwijderd]
0
Het is nu even niet anders, DeWegNaarBeter. Effe doorbijten.

Deze tijd vraagt om een iets andere waardering. En waarschijnlijk spelen er nog een paar zeer korte termijn ontwikkelingen een rol bij de huidige koers, die als laag wordt ervaren als blijft men vasthouden aan de standaarden uit het recente verleden.

Er is nu dividend, wat ook nog positief gaat uitwerken op de vraag naar het aandeel maar nu even niet, dus gewoon blijven poetsen.

Groet

P.S. Vóór februari moet er klaarheid komen omtrent de toekomst voor de staalindustrie in Europa. Dat moment verandert alles. Ondertussen... doorbijten en opletten.
voda
0
Wie voorspelt de koers van MT op 31 december a.s bij het sluiten van de beurs, en wint een virtuele ijstaart?
(Deelnemen kan tot en met 14 december a.s, sluiten van de beurs)

Audit4life. 17,75
voda 19,00
Max. 19,99
Snuf 14 20.00
Kooning 20,78
Tukker51 20,80
Many-S. 21,23
Archie Steel. 21,80
De weg naar 22,00
Moutain Lion 22,22
Bir. 22,45
Modaaltje 22,50
Cherubijn 24,14
Pussy. 25,85

Gr Snuf. (Pussy Golightly op 25.85 lekker optimistisch)
voda
0
How ArcelorMittal plans to put Ilva back

ArcelorMittal's management believes strongly in the potential of its newly acquired Italian branch. On December 11, the group unveiled in Paris its roadmap to make the worst steel mill in Europe a site of excellence.
How ArcelorMittal plans to put Ilva back ArcelorMittal has launched the major renovation and transformation project of the Ilva steelworks in Taranto (Italy). © ArcelorMittal

It must be admitted, in 2015, at the announcement of his interest in Ilva and its steel plant in Taranto (the most polluting in Europe), we grimaced. A bit like when a real estate agent tells us about enormous potential in front of an apartment visibly eaten away by moisture or termites. Four years later, Mathieu Jehl, CEO of ArcelorMittal Italia, and Aditya Mittal Group Chairman, do not stop there: Ilva is "a strategic asset for ArcelorMittal" . This costly acquisition serves two purposes: to position itself strongly in the Italian market, Europe's second largest steel consumer, and to concentrate production on large-scale sites. Ilva is the largest integrated steel mill on the continent.

Admittedly, 2.4 billion euros of capex for a steel plant that leaks as many pollutants as cash is expensive. The sum is so enormous that it has to be brought back to a more reasonable scale to grasp its magnitude. This is more than a million euros invested every day by 2024. But it is the effort needed to put Ilva back to the level of environmental and economic demands of the steel group.

Discount to environmental standards

The first goal is to stop the bleeding. Not financial (we'll see that it is promised to a quick end anyway), but reputation. It all starts with the identification of risks and the training of staff. Of the 13,800 employees of Ilva, ArcelorMittal rehire 10,700. That is 260 contracts to sign daily by January. In November and December, 7,500 employees will have attended the safety training, the group's operational tools and information campaigns are put in place on protections and risky behavior.

At the same time, work on environmental compliance of the site is progressing rapidly. They represent half of the total reinvestment of ArcelorMittal, or 1.15 billion euros. Half a million a day. The raw material storage facilities are being covered by a huge structure for an amount of 300 million euros. A project "unique in Europe", says ArcelorMittal. The operation is expected to be completed by the end of 2019 for the iron ore park by May 2020 for the coal (coke and thermal) facility. This will also be the case for conveyors. "All buildings and equipment from which dust will escape will be closed," promises Mathieu Jehl.

The sealing, recovery and treatment of runoff and process water are dedicated to 167 million euros. Filters will be installed on the chimneys of the agglomeration units (by 2021 for the first and 2022 for the second) to reduce emissions of dust, metal particles and dioxins below the European thresholds (35 million euros ). The coking plant will be fully restored to the highest standards (desulphurization of coke oven gas in particular) for 200 million euros. Lastly, the Fire Prevention Plan is allocated 40 million. The balance is allocated to various environmental improvements.

Stop the financial bleeding

On the roadmap of ArcelorMittal for Ilva, the stop of the operational losses intervenes as of 2019. A challenge, for a company which lost until then 20 to 25 million euros per month. Beyond this horizon, it will be working on the incremental improvement of operational excellence. In the longer term, ArcelorMittal intends to deploy, in Italy as elsewhere, the pilots currently developed in R & D (charcoal, ethanol, hydrogen ...) to go towards a carbon-free steel. If confirmed, such a turnaround will dream more than one industrialist. The target set is to reach by 2019 a production of 6 million tons of crude steel.

To achieve this goal, the group put the means. It allocates 1.25 billion euros of risk capital to operational improvement. Among the major investment stations, blast furnaces and converter will swallow some 350 million euros, the mechanical upgrade and automation of the finalization of products 250 million, the power plant 60 million ...

"The three levels of our activity - buying, producing, selling - have been questioned and will be optimized," says Mathieu Jehl. "Ninety percent of the problems in Ilva have already been encountered elsewhere in the group ," says the leader, " Rather than reinventing the wheel, we will be importing solutions .

Source : Strategic Research Institute
Bijlage:
voda
0
EU demand for construction steel still well below pre-crisis levels - ArcelorMittal

Reuters quoted ArcelorMittal, the world's biggest steelmaker, as saying that Europe's demand for construction steel is down nearly 20 per cent versus its pre-financial crisis peak, with the market still battling excess capacity. EU steel prices have recovered sharply since hitting decade lows in late 2015, but investors are growing concerned that the sector will struggle if China's economy slows further as the trade dispute between the United States and China drags on. China produces and consumes half the world's steel, a global industry seen as strategic for growth and national security.

Mr Augustine Kochuparampil, chief executive of ArcelorMittal Europe, Long Products, told reporters at a briefing in Paris "We have huge overcapacity in long (construction) steel in Europe. European mills used 65 per cent of their capacity in construction steel last year. In 2007 they used 80 per cent - a level investors say indicates a healthy industry where mills have pricing power.

Mr Kochuparampil said that EU demand for long, or construction steel, is forecast at 57 million tonnes this year versus 69 million tonnes in 2008.

Source : Reuters
1.010 Posts, Pagina: « 1 2 3 4 5 6 ... 26 27 28 29 30 31 32 33 34 35 36 ... 47 48 49 50 51 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Detail

Vertraagd 18 apr 2024 17:35
Koers 23,800
Verschil 0,000 (0,00%)
Hoog 23,960
Laag 23,560
Volume 2.676.573
Volume gemiddeld 2.411.545
Volume gisteren 2.676.573

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront