BAM Groep « Terug naar discussie overzicht

BAM juli 2021

1.150 Posts, Pagina: « 1 2 3 4 5 6 ... 30 31 32 33 34 35 36 37 38 39 40 ... 54 55 56 57 58 » | Laatste
innicksname
0
quote:

€d_Modus Vivendi schreef op 20 juli 2021 09:45:

Na deze riante zorgeloze koersstijging wordt het tijd voor de fiets...
kleinste stijger na grootste daler als vanouds.
Eerst de warming-up, daarna pas knallen.
€d_Modus Vivendi
1

AM viert realisatie dertig woningen Markus Keteer in Maastricht
20 juli 2021 - AM bv / BAM Wonen bv
AM viert realisatie dertig woningen Markus Keteer in Maastricht

Maastricht, 19 juli 2021 - Gebiedsontwikkelaar AM staat op maandag 19 juli met een officiële feestelijke handeling stil bij de bouw van dertig woningen aan de Toernooiruwe in Malberg, Maastricht. De bouw is in het voorjaar al gestart maar wordt nu officieel online gevierd, samen met de kopers en betrokkenen van het project. Wethouder Gert-Jan Krabbendam van de gemeente Maastricht, Jaap van Engelshoven (adjunct-directeur AM Zuidwest) en Maarten Strijdonk (directeur bij BAM Wonen) zijn aanwezig op de locatie zelf.

Gert-Jan Krabbendam: ‘Met deze woningen is er een plek gecreëerd waar veel mensen zich thuis voelen. Een groot deel van de kopers woonde al in de buurt. Dat zij weer kiezen voor een huis in Malberg geeft aan dat er vertrouwen is in de wijk. Als gemeente zijn wij blij dat we hier een rol in hebben gespeeld en als wethouder Klimaat & Energie, Ruimtelijke ontwikkeling en Mobiliteit ben ik extra trots dat deze plek in Maastricht bijdraagt aan een duurzame, klimaatneutrale stad waar het prettig is om in te wonen, werken en recreëren.’

Jaap van Engelshoven: ‘Met deze ontwikkeling geeft AM invulling aan een van haar maatschappelijke thema’s, Gelukkig leven. ’t Markus Keteer is mooi ingepast in de bestaande wijk Malberg waarbij bewoners hun woning naar keuze kunnen indelen. Met het aanbod van betaalbare energiezuinige woningen met een tuin, komen wij tegemoet aan de grote vraag naar wonen, voor starters en doorstromers.’

’t Markus Keteer

Op de voormalige locatie van de oude Markusschool in Malberg is in het voorjaar de bouw gestart van deze dertig moderne en energiezuinige woningen die samen 't Markus Keteer vormen. De woningen kenmerken zich door een strakke, minimalistische stijl en moderne uitstraling naar een ontwerp van Benedict Kraus in samenwerking met VTwonen. Witte gevels, donkere kozijnen en houten shutters zorgen voor een eigentijdse uitstraling. De toekomstige bewoners hadden de keuze uit diverse indelingsvarianten en uitbreidingsmogelijkheden. Alle woningen in Markus Keteer zijn energiezuinig. Zo beschikken ze over zonnepanelen, een lucht/water warmtepomp en zijn ze optimaal geïsoleerd.

Aan de west- en zuidrand van het plan bevinden zich ruime groenstroken met grote bomen. Het binnengebied met de parkeergelegenheid voor bewoners en bezoekers, wordt ook voorzien van grote bomen.

Alle dertig woningen zijn verkocht. De bouw is in handen van BAM Wonen.
Gelukkig leven

Met dit project geeft AM invulling aan haar maatschappelijke thema ‘Gelukkig leven’. Door de mooie inpassing van ’t Markus Keteer in de bestaande wijk Malberg genieten bewoners straks van eigentijdse en toekomstbestendige woningen die naar keuze kunnen worden ingedeeld. Er zijn diverse faciliteiten als een school, een sportpark en een uitgebreid winkelcentrum dichtbij. Ook de binnenstad met tal van winkel-, cultuur- en horecavoorzieningen ligt op fietsafstand. Al deze voorzieningen en ook de rust en recreatiemogelijkheden van het nabijgelegen en natuurrijke Zouwdal, maken het ‘t Markus Keteer tot een fijne woon- en verblijfplaats voor haar bewoners.

Nadere informatie: AM, afdeling in- en externe communicatie, (030) 609 72 22 of communicatie@am.nl.

Illustraties in hoge resolutie zijn te downloaden bij het persbericht op www.am.nl.
€d_Modus Vivendi
1

De Alliantie en BAM Wonen starten verduurzaming 61 historische huurwoningen in Wijkje 77 in Amersfoort
20 juli 2021 - BAM Wonen bv
Wijkje 77 (Fotograaf: Fred Oosterhuis).

Amersfoort, 20 juli 2021 - De Alliantie en BAM Wonen starten met de verduurzaming van de 61 historische sociale huurwoningen in Wijkje 77 (Berg Zuid) in Amersfoort. Het project is in nauwe samenwerking met de bewoners vormgegeven. De werkzaamheden starten eind augustus. De oplevering staat gepland voor begin 2022.
Bewoners denken mee

Het verduurzamingsplan is samen met de bewoners gemaakt. Want de bewoners kennen de buurt en de woning als geen ander. Die kennis hebben De Alliantie en BAM Wonen dankbaar gebruikt voor het maken van het definitieve plan. De bewoners van de wijk hebben een hechte band met Wijkje 77 en de sociale cohesie is groot, net als de waardering voor de historische architectuur van de wijk. Ruim zeventig procent van alle bewoners van de huurwoningen gaf zijn instemming aan het plan. Dit is voor De Alliantie en BAM het bewijs dat het plan goed past bij de verwachtingen die iedereen heeft.
Energie-ambitie

De woningen worden tijdens de verduurzaming van een gemiddeld energielabel F/G naar een gemiddeld energielabel A/B gebracht. Dit maakt dat de woningen straks comfortabeler zijn en de huurders lagere energiekosten hebben. Om dit energielabel te bereiken, wordt een isolatiepakket aangebracht en waar nodig wordt de verwarming vervangen door HR-ketels. De vervanging van de rioleringsaansluitingen wordt in de werkzaamheden meegenomen. De bewoners kunnen tijdens de renovatie in hun woning blijven wonen.
Beschermd stadsgezicht

Wijkje 77 omvat de Joannes Tolliusstraat, Westerstraat en de Leenaert Nicasius (dwars)straat. De woningen zijn van rond 1900 en maken deel uit van een beschermd stadsgezicht. De tuindorpachtige opzet, smalle straatjes en behouden historische architectuur maken het beschermde stadsgezicht bijzonder. De woningverbetering wordt dan ook met behoud van de architectuurstijl en historische uitstraling uitgevoerd.
Nadere informatie

De Alliantie, Petra van Schaik, adviseur communicatie: pvanschaik@de-alliantie.nl;
BAM Wonen, afdeling Communicatie, (030) 659 89 44, communicatie.wonen@bam.com.

€d_Modus Vivendi
1

BAM Telecom start met aanleg glasvezelnetwerk in Hoeksche Waard
20 juli 2021 - BAM Telecom bv
BAM Telecom start met aanleg glasvezelnetwerk in Hoeksche Waard

Strijen, 19 juli 2021 - Met het plaatsen van de eerste PoP-behuizing (Point of Presence) in Strijen heeft BAM Telecom een belangrijke stap gezet in het project FttH (Fiber to the Home) Hoeksche Waard. Vanuit de PoP wordt de glasvezelverbinding tot stand gebracht met woningen en bedrijven in de omgeving.

In opdracht van E-Fiber realiseert BAM Telecom in anderhalf jaar tijd 18.500 glasvezelverbindingen in vijf dorpskernen, inclusief buitengebieden, en industriegebieden in de Hoeksche Waard. In totaal worden acht PoP-behuizingen geplaatst en tweeduizend kilometer glasvezelkabel aangelegd. Eind dit jaar zijn de eerste huishoudens aangesloten op het nieuwe netwerk.

Projectleider BAM Telecom, Mike Steehouwer: ‘Het is mooi om te zien hoe we met onze kennis, ervaring en manier van samenwerken een duurzame toekomst in praktijk brengen.’

Mol T
2
quote:

€d_Modus Vivendi schreef op 20 juli 2021 09:45:

Na deze riante zorgeloze koersstijging wordt het tijd voor de fiets...
kleinste stijger na grootste daler als vanouds.
BAM is mijn best presterende aandeel in mijn PF. Dat kan alleen maar als de stijgers groter zijn dan de dalers tov andere aandelen. Gekocht en na daling diverse keren bijgekocht.
In mijn PF zitten aandelen en ETF's over de hele wereld en over allerlei sectoren.
Vandaag stijgt BAM ook het hardst (op Infosys na). AEX doet nu 0.23% en BAM 2%.
BAM is volatiel en reageert heftiger dan andere aandelen, maar ik heb wel vaker gezien dat BAM een eigenwijze koers vaart - in de min maar ook in de plus.

Ik volg BAM echter maar 2 jaar, mijn ervaring is dus wellicht minder beïnvloed door de neergaande trend in voorgaande jaren.

€d_Modus Vivendi
0
quote:

Mol T schreef op 20 juli 2021 12:47:

[...]


Ik volg BAM echter maar 2 jaar, mijn ervaring is dus wellicht minder beïnvloed door de neergaande trend in voorgaande jaren.

juist, neemt niet weg dat BAM na een spurt vanaf 1,01 nog steeds aan het zwalken is, soms met reden maar vaker omdat het kan..
€d_Modus Vivendi
1

Contractors sought on £640m building frameworks

20 Jul 2021 By Joshua Stein

Two building frameworks, available to Yorkshire, the North East and parts of the East of England and Midlands, are open for tender to a total value of £640m.

Contractors are on call for a YORBuild West framework, worth £400m, serving Yorkshire, Leicestershire, Derbyshire and Nottinghamshire. In the North East, Yorkshire and Lincolnshire, a separate YORBuild framework has opened to the tune of £240m. Both cover building works and new housing principally, with some scope for civil engineering works.

The frameworks are split into two lots each. One is for new housing and general building works, including some civil engineering, for projects between £4m and £10m. The other covers new housing developments with more than 25 houses.

Both frameworks are set to run for four years, but could be extended for an additional two years, which YORBuild said would give contractors time to “recoup their significant initial investment” in delivering better construction in line with the government’s Construction Playbook objectives. These include economic regeneration, carbon and waste reduction, training and employment initiatives, training of their staff to new ways of working and utilisation of BIM.

YORBuild added that the frameworks aimed to have greater levels of collaboration between clients and contractors, which may take longer than four years to realise, particularly as some clients might not use the agreements in their early years.

YORBuild is intended to be used by public sector bodies such the NHS, local government and education bodies, as well as third-sector outfits such as housing associations.

Last year, Kier and Interserve were some of the winners on a £1.5bn YORBuild framework in the Yorkshire region, the successor to the YORbuild2 framework, through which Kier delivered the Ponteland school (featured picture). Bam Construction, Galliford Try, Morgan Sindall and Wates also secured spots on two lots of the framework.

Requests to participate in the tender processes must be submitted by 17 September.
€d_Modus Vivendi
0
quote:

popie schreef op 20 juli 2021 15:29:

We knallen naar rood !!
het is bij Heij niet anders
Eens het lul altijd het lul lijkt het
HenkdeV
0
quote:

popie schreef op 20 juli 2021 17:00:

Het is hier net oud jaar nu knallen we weer omhoog.nou ja knallen .....
Er moet ook nog wat ruimte omhoog overblijven voor morgen:-).
€d_Modus Vivendi
0
short unch 19-7
en de US, alles vergeten, we speren weer richting ruimte...niet gratis maar toch.
HenkdeV
0
Deel beurscommentaar vandaag Telegraaf:

Beleggingsstrateeg Olaf van den Heuvel (Aegon Asset Management) ziet meerdere redenen voor de stevige terugval van de aandelenkoersen op maandag. „Enerzijds is er een sterke toename van het aantal nieuwe coronabesmettingen door de opkomst van de deltavariant. Bovendien is er angst voor het terugschroeven van het obligatieopkoopprogramma door centrale banken. Het economische herstel verloopt ook minder krachtig dan gedacht. Dit zie je terug in de surprise indices. In China zijn er zelfs veel meer tegenvallers dan meevallers en in de VS houden deze elkaar in evenwicht.”

Van den Heuvel verwacht dat de beurzen de komende weken zullen blijven kwakkelen. „Het herstel na de crisis is grotendeels ingeprijsd. Publicaties van bedrijfscijfers worden ook slechts goed ontvangen als deze behoorlijk positief verrassen. Wel is het zo dat centrale banken door de toegenomen economische onzekerheden misschien wat later op de rem zullen trappen. Op de geldmarkt wordt nu een Fed-rente van 1,1% in december 2023 ingeprijsd, bijna een kwartje minder dan twee weken geleden.”
HenkdeV
0
Door ABM Financial News op dinsdag 20 juli 2021

Wall Street koerst hoger

(ABM FN-Dow Jones) De Amerikaanse beurzen noteerden dinsdag flink hoger, met nog een paar uur handel te gaan. De S&P 500 index, Dow Jones index en Nasdaq wonnen alledrie zo'n 1,7 procent.

"Als je een verkoopgolf krijgt zoals we gisteren hadden, zullen er zeker enkele investeerders zijn die dat zullen zien als een kans om voor de langere termijn te investeren", verklaarde marktstrateeg Kiran Ganesh van UBS Global Wealth Management het herstel van dinsdag op de beurzen in New York.

Of de correctie inmiddels achter de rug is, daarover zijn beursexperts het niet eens. Vooral de impact van de vlot oplopende coronabesmettingen door de deltavariant zorgt voor onzekerheid, volgens valuta-analist Ima Sammani van Monex Europe.

Macro-economisch is het een rustige dag, met in de Verenigde Staten louter cijfers over de woningbouw op de rol. Er bleken in juni meer woningen in aanbouw genomen, maar ook minder nieuwe vergunningen verstrekt.

De dollar wint opnieuw aan kracht. De euro/dollar handelde dinsdagavond op 1,1777. Olie wist iets te herstellen van de dip van maandag. De prijs voor een bitcoin daalde met 4,0 procent tot 29.700 dollar.
HenkdeV
0
Wall Street laat krachtig herstel zien: Dow wint ruim 500 punten terug
Gisteren, 22:01 in FINANCIEEL

NEW YORK (ANP) - De aandelenbeurzen in New York hebben dinsdag een stevig herstel getoond na de zware koersverliezen een dag eerder door zorgen bij beleggers over de opmars van de Delta-variant en het economisch herstel van de coronacrisis.

De Dow-Jonesindex eindigt op een plus van 1,6% bij 34.511punten. De brede S&P 500 klimt 1,5% tot 4324 punten en de technologiebeurs Nasdaq wint 1,6% tot 14.498 punten.
€d_Modus Vivendi
0
quote:

innicksname schreef op 21 juli 2021 09:03:

Mooi pandje, maar het verslag legt wel een behoorlijke wanhoop bloot: www.irishnews.com/news/republicofirel...
Cate McCurry, Pennsylvania
08 juli 2021 12:45

De regering van Dublin is beschuldigd van het schrijven van een blanco cheque voor het nieuwe kinderziekenhuis, omdat de stijgende kosten werden toegeschreven aan "ministeriële incompetentie".

Pearse Doherty van Sinn Féin beschuldigde de regering van een hands-off benadering van het nieuwe ziekenhuis nadat het ministerie van Volksgezondheid had gezegd dat het geen werkbare schatting had van de uiteindelijke kosten.

De Donegal TD wijt de kostenoverschrijding, die is gestegen tot ten minste € 1,7 miljard, aan het aanbestedingsproces in twee fasen, dat bedoeld was om een ??aanzienlijke stijging van de kosten te voorkomen.

Eamon Ryan vertelde de Dáil dat hij de uiteindelijke kosten van het ziekenhuis niet kon geven en zei dat het een live project was.

"Er zijn tijdens dit proces serieuze en aanzienlijke kostenstijgingen geweest en contractuele regelingen gewijzigd", zei de minister van Transport.

“We hebben een breder probleem van aanzienlijke inflatiekosten in de bouwsector.

“We hebben ook een groot probleem, we erkennen dit allemaal, in de planning en ontwikkeling, en de kosten en oplevering van grote openbare bouwprojecten in dit land.

“En het Kinderziekenhuis is daar, vrees ik, een ongelooflijk kritisch voorbeeld van.”

De heer Ryan zei dat de langdurige plannings- en bouwprocessen een van de "kritieke factoren" waren in de stijging van de kosten en overschrijdingen.

Hij voegde eraan toe: “Het hoofdproject is geteisterd door aanzienlijke vertragingen.

"Ik denk dat een deel van de lessen die we daaruit moeten leren, is dat dit contractproces in twee fasen, waar de grote lijnen werden afgesproken, maar toen tijdens het proces verdere contractuele problemen opdoken - daar zouden we lessen uit moeten trekken."

Hij wees ook op problemen met de pandemie, de beschikbaarheid van werknemers en de sluiting en heropening van de bouwsector vanwege Covid-19.

"We hebben een breder probleem van tekorten aan vaardigheden in onze economie, die ook de bouwprijzen opdrijven, vooral in de bouwsector", voegde hij eraan toe.

"Geen van die zaken zal onmiddellijk worden opgelost."

Gisteren bleek dat de hoofdaannemer van het project 900 claims heeft ingediend over het project.

De Gemengde Gezondheidscommissie van Oireachtas hoorde dat er een moratorium is op de behandeling van alle nieuwe en lopende claims.

De heer Doherty zei: “Ik geloof dat de ministers van het kabinet een hands-off benadering hebben gekozen in dit verband.

“Volgens mij weet je niet wat de geschatte kosten zijn.

'Misschien wil je het niet weten.

“Waar ik het wel met je eens ben, is de oorzaak hiervan als het tweetraps inkoopproces, een proces dat Leo Varadkar als minister van gezondheid heeft ondertekend.

“De oorzaak hiervan is ministeriële incompetentie.”

Uit een PWC-rapport bleek dat een gebrek aan budgettering en "zwakheden" in de initiële planning leidden tot een aanzienlijke stijging van de kosten.

"Daarom hebben we een situatie waarin Leo Varadkar beloofde dat dit project tegen 2020 zou worden gebouwd en dat de totale kosten, inclusief onvoorziene omstandigheden en inflatie, € 650 miljoen zouden bedragen", voegde de heer Doherty eraan toe.

“We weten dat we bedragen hebben van 1,7 miljard euro, we hebben 900 openstaande claims en serieus, als leider van uw partij, als senior lid in het kabinet, kunt u de Dáil niet eens vertellen wat de totale omvang van die claims is?

“Moeten we u toestaan ??om een ??blanco cheque te blijven schrijven met betrekking tot dit project?”
1.150 Posts, Pagina: « 1 2 3 4 5 6 ... 30 31 32 33 34 35 36 37 38 39 40 ... 54 55 56 57 58 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Detail

Vertraagd 18 apr 2024 17:35
Koers 3,830
Verschil +0,008 (+0,21%)
Hoog 3,868
Laag 3,782
Volume 705.352
Volume gemiddeld 1.427.326
Volume gisteren 943.988

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront