BAM Groep « Terug naar discussie overzicht

BAM Augustus 2016

999 Posts, Pagina: « 1 2 3 4 5 6 ... 44 45 46 47 48 49 50 » | Laatste
€d_Modus Vivendi
0
€d_Modus Vivendi
0
UCLan picks engineering centre contractor
30 Aug 2016, 10:31

Bam Construction has been appointed to build the University of Central Lancashire’s 35€m Engineering Innovation Centre, with construction expected to begin in January 2017 and complete for summer 2018.

Located in Preston city centre, the EIC will combine teaching, research and business space.

Michael Ahern, chief operating officer at UCLan, said: “Bam has extensive experience in the education sector and recent key projects include the University of Manchester’s National Graphene Institute, University College London Academy, and University of Arts London’s St Martin’s Campus.”

The EIC is the first major part of UCLan’s 234€m new campus masterplan. Funding of 12€m has been provided for the project by the Lancashire Enterprise Partnership’s Growth Deal with Government. A further 6€m came from the Higher Education Funding Council for England. An application is pending with the European Regional Development Fund.

SimpsonHaugh & Partners is leading on the design in collaboration with Reiach & Hall Architects. BDP is providing engineering advice.
- See more at: www.placenorthwest.co.uk/news/uclan-p...
[verwijderd]
0
quote:

€d_Modus Vivendi schreef op 30 augustus 2016 12:01:

UCLan picks engineering centre contractor
30 Aug 2016, 10:31

Bam Construction has been appointed to build the University of Central Lancashire’s 35€m Engineering Innovation Centre, with construction expected to begin in January 2017 and complete for summer 2018.

Located in Preston city centre, the EIC will combine teaching, research and business space.

Michael Ahern, chief operating officer at UCLan, said: “Bam has extensive experience in the education sector and recent key projects include the University of Manchester’s National Graphene Institute, University College London Academy, and University of Arts London’s St Martin’s Campus.”

The EIC is the first major part of UCLan’s 234€m new campus masterplan. Funding of 12€m has been provided for the project by the Lancashire Enterprise Partnership’s Growth Deal with Government. A further 6€m came from the Higher Education Funding Council for England. An application is pending with the European Regional Development Fund.

SimpsonHaugh & Partners is leading on the design in collaboration with Reiach & Hall Architects. BDP is providing engineering advice.
- See more at: www.placenorthwest.co.uk/news/uclan-p...
Komt BAM daarmee met een persbericht?
[verwijderd]
0
quote:

€d_Modus Vivendi schreef op 30 augustus 2016 12:26:

en weer zo'n eikel met 78k ask op 4,07
..lijkt me steeds dezelfde 'grote jongen' die zowel aan- als verkoopt om de koers rond de € 4,05 vast te houden. 'Grote jongens' betalen immers nauwelijks transactiekosten..
BoterbijdeVis
0
Bij DAX-down: BAM gekoppeld aan DAX :-(
Bij DAX-up : BAM gekoppeld aan de MM-etjes :-((
€d_Modus Vivendi
0
nog maar eens:
BAM Construction has been selected to build the University of Central Lancashire’s (UCLan) 35€m Engineering Innovation Centre (EIC).
UCLan's Engineering Innovation Centre
Above: UCLan's Engineering Innovation Centre

The EIC will provide teaching and research space for the university in Preston city centre.

BAM is expected to begin construction in January 2017 and complete during summer 2018.

The new building is the first stage in UCLan’s 235€m campus masterplan. As a signature project within Lancashire’s strategic economic plan, it and has secured 12€m from the Lancashire Enterprise Partnership's (LEP) Lancashire ‘growth deal’ with central government.

It has further 6€m from the Education Funding Council for England, which will go towards equipping the facility with technology and equipment. An application for European Regional Development Fund (ERDF) funding has also been made to enhance engagement between the university and local engineering companies.

UCLan chief operating officer Michael Ahern said: “The selection of BAM Construction is excellent news and takes us even closer to realising our vision for the EIC. BAM has extensive experience in the education sector and recent key projects include the University of Manchester’s National Graphene Institute, University College London Academy, and University of Arts London’s St Martin’s Campus.”
Peett
0
quote:

€d_Modus Vivendi schreef op 31 augustus 2016 08:27:

nog maar eens:
BAM Construction has been selected to build the University of Central Lancashire’s (UCLan) 35€m Engineering Innovation Centre (EIC).
UCLan's Engineering Innovation Centre
Above: UCLan's Engineering Innovation Centre

The EIC will provide teaching and research space for the university in Preston city centre.

BAM is expected to begin construction in January 2017 and complete during summer 2018.

The new building is the first stage in UCLan’s 235€m campus masterplan. As a signature project within Lancashire’s strategic economic plan, it and has secured 12€m from the Lancashire Enterprise Partnership's (LEP) Lancashire ‘growth deal’ with central government.

It has further 6€m from the Education Funding Council for England, which will go towards equipping the facility with technology and equipment. An application for European Regional Development Fund (ERDF) funding has also been made to enhance engagement between the university and local engineering companies.

UCLan chief operating officer Michael Ahern said: “The selection of BAM Construction is excellent news and takes us even closer to realising our vision for the EIC. BAM has extensive experience in the education sector and recent key projects include the University of Manchester’s National Graphene Institute, University College London Academy, and University of Arts London’s St Martin’s Campus.”
Eens zien Ed of dit de koers naar de 4,15 kan brengen deze dag. Succes.
turbobb
0
quote:

€d_Modus Vivendi schreef op 31 augustus 2016 08:36:

yep, ik ga in Zandvoort mijn zandkasteeltje bouwen...
Kijk,dat is het betere bouwwerk. Enjoy.
RIZ
0
heeft iemand een overzicht wat er nog zit een te komen aan grote opdrachten de komende dagen/weken?
[verwijderd]
0
quote:

€d_Modus Vivendi schreef op 31 augustus 2016 08:36:

yep, ik ga in Zandvoort mijn zandkasteeltje bouwen...
Die staan nu zelfs in het dorp. Zandvoort heeft trouwens een erg goede Griek (Zara). Pikilia daar heel erg lekker. Anyway veel plezier.
999 Posts, Pagina: « 1 2 3 4 5 6 ... 44 45 46 47 48 49 50 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Detail

Vertraagd 26 apr 2024 17:35
Koers 3,896
Verschil -0,004 (-0,10%)
Hoog 3,932
Laag 3,872
Volume 525.331
Volume gemiddeld 1.431.691
Volume gisteren 691.847

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront